Solution No. 1: Replacing the air heater for Boiler 1A | |
Real situation Tubes of air heater are old, punctured, broken and dusty: -Boiler exit flue gas temperatureis is high (1650C); -The coefficient of excess air after the air preheater is high; -The degree of opening the damper of the air fan and induced draft fan is large. The above situations cause heat loss according to large exhaust gas, reducing boiler efficiency, increasing power consumption for air fans and draft fans. | Expected output Using a new air heater and adjusting the excess air coefficient appropriately will reduce the exhaust flue gas temperature(to 1330C) and the excess air coefficient, leading to heat loss reduction and increasing boiler efficiency to 85,38% and decreasing power consumption of the air fan and draft fan. |
Energy efficiency results | |
Coal savings: 6,091 tons/year | Investment cost: VND 5.421 billion |
Cost savings: VND 11.347 billion | Payback period: 0.478 year |
Solution No. 2: Installing inverter for circulating pump motor of the line 1 | |
Real situation - Low water flow through circulation pump - High power capacity | Expected output After the installation of the inverter for the circulating water pump motor to adjust pump speed according to the total pump head pressure, the pump's power consumption will reduce from 1,839kW to 1,421kW resulting to decreasing energy cost. |
Energy efficiency results | |
Electricity savings: 2,708,640 kWh/year | Investment cost: VND 9.371billion |
Cost savings: VND 3.334 billion | Payback period: 2.81 years |
Solution No. 3: Installing heat pump for unit 5 of the line 2 | |
Real situation - High temperature of water into the condenser reduces the cooling efficiency of condenser; - The water temperature on the condenser water system is low. | Expected output After the installation of the heat pump, the temperature of the circulating water to the condenser will decrease and at the same time, the heat will be transferred to the condensate water resulting to steam and electric power savings. |
Energy efficiency results | |
Electricity savings: 16,435,418 kWh/year | Investment cost: VND 38.66 billion |
Cost savings: VND 20.232 billion | Payback period: 1.91 years |
Pha Lai Thermal Power JSC is one of 10 enterprises entitled to energy audit implementation within the framework of the Project for Promoting Investment Market for Energy Efficiency in Industrial Sector in Vietnam, funded by the Korean Government through Korean International Cooperation Agency (KOICA). Northern Electrical Testing One Member Company Limited cooperated with Korean energy experts in conducing detailed energy audit at the unit 1 of line 1 and unit 5 of line 2from October 29, 2018 to November 16, 2018. |