Energy audit result of Viet Thang Corporation - JSC
19/09/2019
 

| Solution No. 1: Replace belt drive with coaxial transmission for central dust collection system | |
| Real situation  Centrifugal fans have actuators with belt which is easy to be made, cheap and simple to operate. However, in the operation process, electricity consumption of fan will be loss by belt’s friction and belt slack.  | Expected output  Replacing Belt Drive With Coaxial Drive results in reduction of investment cost in engine and energy consumption.  | 
| Energy efficiency results | |
| Electricity savings: 498,960 kWh/year | Investment cost: VND1.8 billion | 
| Cost savings: VND831 million | Payback period: 2.2 years | 
| Solution No. 2: Insulate steam valves, steam pipes, feed water pipe, condensate pipe | |
| Real situation  Steam valves, steam pipes, feed water pipes and condensate pipes have not been insulated yet leading to significant heat losses to the environment.   | Expected output  Insulting surfaces whose temperature is higher than 600C  or using insulating jacket surfaces that require flexibility avoids heat losses and create good working conditions for employees.  | 
| Energy efficiency results | |
| Coal savings: 60 tons/ year | Investment cost: VND15 million | 
| Cost savings: VND84 million / year | Payback period: 0.2 year | 
| Solution No. 3: Re-install the air preheater of boiler | |
| Real situation  Air preheater is installed incorrectly compared to the design, resulting in reduce efficiency. | Expected output  Re-installing the air preheater helps maximizing the heat exchange capacity between input air and outlet flue gas.  | 
| Energy efficiency results | |
| Coal savings: 57 tons/ year | Investment cost depends on the agreement between the company and the equipment supplier | 
| Cost savings: VND80 million / year | Payback period depends on the investment cost | 
| Viet Thang Corporation - JSC is one of 10 enterprises entitled to energy audit implementation within the framework of the Project for Promoting Investment Market for Energy Efficiency in Industrial Sector in Vietnam, funded by the Korean Government through Korean International Cooperation Agency (KOICA). The energy audit was conducted by the Energy Conservation Research and Development Center (ENERTEAM) in cooperation with Korean energy experts from November 1, 2018 to November 11, 2018. | 
 TNG constantly innovates to ensure sustainable development
                        TNG constantly innovates to ensure sustainable development 
                    
                 IBM sets new climate goal for 2030
                        IBM sets new climate goal for 2030
                    
                 Six EU countries lead push for clean hydrogen support
                        Six EU countries lead push for clean hydrogen support
                    
                 California trash-to-hydrogen plant promises dirt-cheap, super-green H2
                        California trash-to-hydrogen plant promises dirt-cheap, super-green H2
                    
                 Nokia’s liquid-cooled 5G base station cuts CO2 emissions by 80%
                        Nokia’s liquid-cooled 5G base station cuts CO2 emissions by 80%
                    
                 UN Environmental Programme Awards Asian Entrepreneurs For Post Covid-19 Green Business Solutions
                        UN Environmental Programme Awards Asian Entrepreneurs For Post Covid-19 Green Business Solutions
                    
                 Energy audit result of Viet Thang Corporation - JSC
                        Energy audit result of Viet Thang Corporation - JSC  
                    
                 Energy audit result of Formosa Ha Tinh Steel Corporation
                        Energy audit result of Formosa Ha Tinh Steel Corporation