| Solution No.1: Installing hot air pipes to the outside area of the air compressor | |
Real situation The temperature at the air compressor area is very high (25oC) as it does not have hot air ejection system which reducesthe compressor operation performance and increases energy and maintenance costs. | Expected output After hot air pipesare installed to the outside area of the air compressor, the inlet air temperature shall be equal to air compressor in other area (18oC)which increases the compressor operation performance and reduces its energy consumption. |
| Energy efficency results | |
| Electricity savings: 2,592 kWh/year | Investment cost: VND 10 million |
| Cost savings: VND 4.62 million/ year | Payback period: 2.6 years |
| Solution No. 2: Improving excess air rate of 4 ton boiler | |
Real situation The proportion of O2 in discharge smoke(14,8%)is much higher than the standard one (3.5-4.8%) for solid fuel boilers causing energy waste. | Expected output After the installation of inverters for air supply fan and air ejection fan, The proportion of O2 in discharge smoke reduces from 14.8% to 4.5%, leading to heat savings of162,556kcal/hour. |
| Energy efficency results | |
| Fuel savings: 550,454 tons/ year | Investment cost: VND 300 million |
| Cost savings: VND 1.274 billion/ year | Payback period: 0.2 year |
| Solution No. 3:Recovering heat from discharge smoke of boiler | |
Real situation Theat recovery equipment which has been recently installed does not work well as the temperature of exhaust fumes is still very high (220oC). | Expected output After the economizer is installed at the position of the existing air preheater, exhaust smokes' temperature reduces from 220oC to 150oC resulting to heat savings of 40,979.68 kcal/hour. |
| Energy efficency results | |
| Fuel savings: 138.77 tons/year | Investment cost: VND 200 million |
| Cost savings: VND 321.253million/year | Payback period: 0.6 year |
| Dabaco Group JSC is one of 10 enterprises entitled to energy audit implementation within the framework of the Project for Promoting Investment Market for Energy Efficiency in Industrial Sector in Vietnam, funded by the Korean Government through Korean International Cooperation Agency (KOICA). The Hanoi Industrial Promotion and Development Consultancy Center conducted a energy audit in collaboration with Korean energy audit expert at the Dabaco TOPFEEDS Feed Mill located at Khac Niem Industrial Zone, Ba Ninh City, Bac Ninh Province from November 19, 2018 to November 30, 2018. |
TNG constantly innovates to ensure sustainable development
IBM sets new climate goal for 2030
Six EU countries lead push for clean hydrogen support
California trash-to-hydrogen plant promises dirt-cheap, super-green H2
Nokia’s liquid-cooled 5G base station cuts CO2 emissions by 80%
UN Environmental Programme Awards Asian Entrepreneurs For Post Covid-19 Green Business Solutions
Energy audit result of Viet Thang Corporation - JSC
Energy audit result of Formosa Ha Tinh Steel Corporation